Business

ECNEC approves Rs70b healthcare bundle


Dr Abdul Hafeez Shaikh chairing the ECNEC assembly on Thursday. Photograph: PID
  • Section-1 260 million gallons per day Karachi Water Provide Scheme (Okay-IV) abstract permitted at estimated value of Rs25.5 billion
  • Section-II of the ‘Pak-China Optic Fiber Cable (OFC) mission price Rs37.9 billion okayed
  • Rs38 billion permitted for building of Gwadar-Ratodero highway mission (M-8)

ISLAMABAD: The Govt Committee of the Nationwide Financial Council (ECNEC) has permitted healthcare tasks price Rs70 billion. 

The choice was taken throughout an ECNEC assembly with Dr Abdul Hafeez Shaikh within the chair on Thursday. 

In response to a report in The Information, the mission features a nationwide well being improve, a nationwide programme for water and sanitation and hygiene, pure calamities management, and novel coronavirus interventions for much less developed areas. 

Taking to Twitter, Federal Minister for Planning and Growth Asad Umar stated that is “the biggest healthcare mission ever carried out by [a] federal authorities”. 

He stated the mission consists of Rs45 billion for brand spanking new healthcare services, Rs7 billion for nationwide well being surveillance, Rs13 billion for water and sanitation and hygiene, and interventions in much less developed areas. 

Additionally learn: Govt will increase revenue charges on Nationwide Saving Schemes certificates

Karachi tasks

A abstract of a higher phase-1 260 million gallons per day Karachi Water Provide Scheme (Okay-IV) was offered earlier than the committee which it permitted at an estimated value of Rs25.5 billion. The anticipated interval of completion is 4 years.

The mission goals to supply environment-friendly water sanitation and waste administration infrastructure to Karachi residents.

One other mission titled “Stable Waste Emergency and Effectivity”, sponsored by the native authorities division of Sindh, with an estimated value of Rs16.8 billion together with an IBRD-World Financial institution mortgage price Rs16 billion, was offered earlier than the committee.

The mission is designed to mitigate the chance of widespread flooding brought on by insufficient strong and liquid waste administration throughout monsoon season and to enhance the strong waste administration infrastructure and repair supply with a view to reworking Karachi into an eco-friendly metropolis in the long term.

The committee additionally permitted Section-II of the ‘Pak-China Optic Fiber Cable (OFC) mission price Rs37.9 billion to ascertain a cross-border OFC community (Khunjerab-Karachi) alongside the China-Pakistan Financial Hall (CPEC) routes. The mission will present an alternate path for worldwide connectivity by the Sino-Pak northern border. 

Learn extra: Govt might lengthen date to avail amnesty scheme for builders, builders

Balochistan tasks

A abstract of the development of the Gwadar-Ratodero highway mission (M-8) was offered earlier than the committee which it permitted at rationalised value of Rs38 billion. The mission was permitted protecting in view its strategic significance as it’s going to facilitate connectivity for CPEC tasks by improved highway linkages.

The committee additionally permitted Bundle IV i.e. building of 100 dams in Balochistan on the complete value of Rs13.5 billion. The mission can be executed by the Balochistan Irrigation Division in three-years-time. The mission is designed to harness flood flows for direct irrigation, groundwater recharge, and agricultural growth by the development of small dams all through the province.

Additionally learn: PTI govt promulgates revenue tax ordinance for building sector

Khyber Pakhtunkhwa tasks

A projected for dualising and enchancment of the previous Bannu highway at an estimated value of Rs17.2 billion from the federal growth funds 2020-21 was additionally permitted.

The mission envisages dualising the present two-lane previous Bannu highway measuring 83-kilometre in size from Gaandi chowk to Sarai Naurang (8km) and Domail to Krapa on N-55 (75km) to 4 lanes with 7.3 metres broad carriageway on both facet.

Scope of labor additionally consists of an extension of present culverts and bridges, building of retaining partitions together with drainage/erosion works, and allied services. The mission can be executed by the Nationwide Freeway Authority.

The committee additionally permitted KP human capital funding mission on the complete value of Rs18.9 billion – the mission has been financed by World Financial institution/ IDA and goals to improve primary schooling infrastructure within the districts of Peshawar, Haripur, Nowshera, and Swabi. 





Source link

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button

Adblock Detected

Please Disable Ad Blocker It's a Humble Request